August progress
All of the walls have been primed inside, 
they have installed the ceiling grid, poured the sidewalk, and have started 
installing the soffit.  They have started tiling one of the 
bathrooms.  The next things they will be working on are the
 outside canopy, 
finish painting, 
flooring,
air conditioning, stairs and ramps, and finish installing the soffit.  It's almost done on the outside, looks great!
 
 
 
          
      
 
  
 
 
 
 
 
 
 
 
 
 