Monday, August 25, 2014

End of August Update












 The inside walls have all been primed, the ceiling grid has been installed, and the sidewalk has been poured.  They have started installing the soffit, and they have started tiling one of the bathrooms.  The next things they will be working on are the outside canopy, finish painting, flooring, air conditioning, stairs and ramps, and finish installing the soffit.  Construction should be finished in September, although we will probably not move into the building until October, since there will still be much work to be done on the inside, decorating, putting in furniture, etc.  But we are very close to having a finished building!

Tuesday, August 12, 2014

August progress














All of the walls have been primed inside, they have installed the ceiling grid, poured the sidewalk, and have started installing the soffit.  They have started tiling one of the bathrooms.  The next things they will be working on are the outside canopy, finish painting, flooring, air conditioning, stairs and ramps, and finish installing the soffit.  It's almost done on the outside, looks great!